Outlook to 2035 and 2050 using three scenarios.
‘Clinker‘ is a key component of cement, produced by sintering (fusing) limestone with other materials, an energy-intensive process.
Contents
- Introduction
- Background
- Outlook for cement demand
- ‘Business as usual’ projections of cement demand
- Potential further reductions in demand for cement
- Potential replacement of traditional cement with clinker-free alternatives
- Scenarios considered
- Projections for cement demand including disruptive factors
- Implications for clinker demand
- Impact on carbon capture and storage (ccs) requirements
- Implications for cement industry carbon emissions
- Conclusions
Scenarios
- Slow change.
- Central.
- Rapid change.
Areas of change
- Loss of market to timber.
- Reduction in supply chain waste.
- Design optimisation.
- Novel clinker free cements.

